The first thing we tackeled was the ceiling. We had wanted to finish it before we had left Minnesota, but we were already so far behind schedule that we decided to leave it until Florida. It's a good thing we did because the insulation we sprayed continued to expand! Imagine if we had put the panels up before the full expansion. We would have a creaky, maybe holey, bus ceiling by now.
We are super insulating this tin can. We put a thin reflective panel in between the 5mm ply and the foam insulation. The Reflectix looks like what a cheap sunshade for your car's windshield is made of. Bubble wrap with foil on both sides.
But after a sloooooooooooow introduction, I finally got the hang of it without hurting myself or my family. I'm glad I was able to cut pieces while Michael was away because I was able to go as slow as I had to. I would sometimes stare at the plywood for a good 5 minutes before making a mark or before clamping it down. Many times, I would mark it incorrectly but I wouldn't figure it out until right before I cut. It was nice to not of the pressure (nor the immediate embarrassment) of having to do it correctly the first time. It was a good learning curve done leisurely!






















